Home Planning MTEP MTEP22 Report

MTEP22 Report

We began the 2022 MISO Transmission Expansion Planning (MTEP22) in 2021 when stakeholders first submitted proposed transmission projects.  MISO engineers and stakeholders continue to evaluate transmission issues and each proposed solution to determine whether the project is appropriate for inclusion in MTEP.

Transmission studies, featuring robust reliability and economic analyses, help MISO members make prudent planning and investment decisions to continue delivering reliable, least-cost energy.  Reliability projects, including age and condition upgrades, a vital part of MTEP planning, account for the majority of all recommended projects.

MISO’s Board of Directors approved the MTEP22 Executive Report and Appendix A during its December 2022 meeting.  Final MTEP22 documents are offered below.

Fleet landscape requires enough capacity be available to meet the needs of all consumers in the MISO footprint to meet peak load serving needs.  To achieve this, MISO supports its states and load-serving entities by providing projected risks and continuously works to improve transparency into near and long-term requirements.

A convergence of trends, including an aging generation fleet and growth of variable energy resources, has required MISO to look at existing processes to support states' and load-serving entities' efforts to satisfy their fleet landscape requirements.  Improvements in MISO processes will benefit the system through ensuring sufficient energy is able to meet operations needs in all times of the year.

Documents

Additional Resources

MISO's generation fleet continues to evolve, and MISO is studying the impacts of increasing levels of renewable resources on the system. MISO also continues to follow federal and state policy as well as monitor industry trends. Additionally, interregional planning is critical to maximize the overall value of the transmission system and deliver savings for customers. 

Interregional studies conducted jointly with MISO's neighboring planning regions are based on an annual review of transmission issues at the seams. Depending on the outcome of those reviews, studies are scoped out and performed.  

Documents

Additional Resources

 

The MISO footprint is not a monolithic area, but a dynamic region made up of different geographies, different generation mixes, varied pricing and conditions that affect load. With its 50 Transmission Owner members, MISO has more than $37.9 billion in transmission assets under its functional control. This section presents additional regional energy information to show a more complete picture of the regional energy system.

Documents

Additional Resources

 

The complete results of MTEP22 reliability assessments are detailed in confidential appendices D3 through D10 and will be available by December 31st on the MISO ShareFile site at https://misoenergy.sharefile.com/, subject to Critical Energy Infrastructure Information and non-disclosure agreements.  These results serve as compliance evidence for a variety of NERC planning standards listed on the MISO public website at http://www.misoenergy.org/planning/transmission-planning/reliability-planning 

Documents