Results 

Loading....

Search Results For 'State and Local Procedural Requirements' ( 925 matches )

+ Add

2017-10-06 Docket No. ER18-41-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 55.
/_layouts/miso/ecm/redirect.aspx?id=260603
+ Add

2017-10-06 Docket No. ER18-44-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 55.
/_layouts/miso/ecm/redirect.aspx?id=260616
+ Add

2017-04-24 Docket No. ER16-1969-003; 004

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 52.
/_layouts/miso/ecm/redirect.aspx?id=248912
+ Add

2017-10-06 Docket No. ER18-42-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 55.
/_layouts/miso/ecm/redirect.aspx?id=260605
+ Add

2014-07-14 Docket No. ER13-187-008

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 35.0.0 Effective On: June 1, 2013 applicable to the planning or siting of transmission facilities by the Transmission Owners.
0 Effective On: June 1, 2013 applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
/_layouts/miso/ecm/redirect.aspx?id=180164
+ Add

2017-11-30 Docket No. ER18-364-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 55.
/_layouts/miso/ecm/redirect.aspx?id=264398

Planning

Learn more about EPA Regulation Impacts Planning Principles and Processes FERC Order 1000 FERC Order 890 Fact Sheet Market-Based Rates Process and Data Planning Guidelines Transmission Owner Planning Criteria State and Local Procedural Requirements Reliability Coordination with PJM and TVA Add JS Code to Display Title in IE Browser tab. ., Planning.aspx
/Planning/Pages/Planning.aspx
+ Add

2015-12-04 Docket No. ER16-469-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 42.
/_layouts/miso/ecm/redirect.aspx?id=213503
+ Add

2017-08-04 Docket No. ER17-2246-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 54.
/_layouts/miso/ecm/redirect.aspx?id=256041
+ Add

2017-10-06 Docket No. ER18-39-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 55.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 56.
/_layouts/miso/ecm/redirect.aspx?id=260596
+ Add

2016-05-19 Docket No. ER16-1746-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 48.
/_layouts/miso/ecm/redirect.aspx?id=225072
+ Add

2012-10-25 Docket No. ER13-187-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=140485
+ Add

2011-11-21 Docket No. ER12-451-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
required to meet the requirements of this interconnection procedure. 6.0 An equipment package does not include equipment provided by the utility. 7.0 Any equipment package approved and listed in a state by that state's regulatory body for interconnected operation in that state prior to the effective date of these small generator interconnection procedures shall be considered certified
/_layouts/miso/ecm/redirect.aspx?id=120705
+ Add

2010-07-15 Docket No. ER10-1791-000 Entire Transmission Cost Allocation

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
compliance with local reliability standards and requirements when applicable, iii) compliance with Transmission Owner standards if applicable, iv) compliance with applicable state and federal laws and v) compliance with applicable regulatory mandates and obligations, including regulatory obligations related to serving load,
/_layouts/miso/ecm/redirect.aspx?id=1730
+ Add

Order 1000 ROFR_DRAFT Attachment FF

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=138158
+ Add

Tariff_Attachment FF DRAFT Order 1000 Revisions 10192012

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=139814
+ Add

DRAFT Order 1000 Att FF_Generic

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=154738
+ Add

Order 1000 Regional Planning Compliance_DRAFT Attachment FF

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=138156
+ Add

2011-08-12 Docket No. ER11-4305-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=114424
+ Add

20130626 PAC Item 03 Draft Attachment FF Changes

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
and maintenance of transmission facilities including, but not limited to, federal, state and local laws, state and local building codes, federal, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
including accepted NERC reliability standards and reliability standards adopted by Regional Entities, local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and Regulations.
/_layouts/miso/ecm/redirect.aspx?id=154763
+ Add

2014-04-08 Docket No. ER12-1564-001

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
including accepted NERC reliability standards and reliability standards adopted by Regional Entities, local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and Regulations.
/_layouts/miso/ecm/redirect.aspx?id=173519
+ Add

2011-11-21 Docket No. ER12-450-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=120702
+ Add

48. Attachment FF - Transmission Expansion Planning Protocol

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 61.
/_layouts/miso/ecm/redirect.aspx?id=19272
+ Add

2011-07-05 Docket No. ER11-3728-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities," as well as "economic or other planning criteria or metrics defined in Attachment FF."25 Since MISO does not seek to waive, and instead undertakes to apply, the reliability and market efficiency criteria in Attachment FF and the Business Practices Manuals
/_layouts/miso/ecm/redirect.aspx?id=119901
+ Add

20170814 CTTT_Proposed Tariff Modifications_Attachment FF

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
including accepted NERC reliability standards and reliability standards adopted by Regional Entities, local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and Regulations.
/_layouts/miso/ecm/redirect.aspx?id=256385

First Prev 1 2 3 4 5 6 ... 37 Next Last

Legend

  • PowerPoint Document
  • PDF Document
  • Word Document
  • Excel Document
  • Add To My Subscriptions
  • Image (GIF/JPG/PNG)
  • Web Page
  • Calendar Event