2014-07-14 Docket No. ER13-187-008

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 35.0.0 Effective On: June 1, 2013 applicable to the planning or siting of transmission facilities by the Transmission Owners.
0 Effective On: June 1, 2013 applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
/_layouts/miso/ecm/redirect.aspx?id=180164
+ Add

2010-07-15 Docket No. ER10-1791-000 Entire Transmission Cost Allocation

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
compliance with local reliability standards and requirements when applicable, iii) compliance with Transmission Owner standards if applicable, iv) compliance with applicable state and federal laws and v) compliance with applicable regulatory mandates and obligations, including regulatory obligations related to serving load,
/_layouts/miso/ecm/redirect.aspx?id=1730
+ Add

2013-12-19 Docket No. ER14-721-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
including accepted NERC reliability standards and reliability standards adopted by Regional Entities, local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and Regulations.
/_layouts/miso/ecm/redirect.aspx?id=166470
+ Add

2011-07-21 Final Rule Order 1000 Docket No. RM10-23

Requirements for which potential transmission solutions will be evaluated in the local or regional transmission planning processes. As part of the process for identifying transmission needs driven by Public Policy Requirements, such procedures must allow stakeholders an opportunity to provide input, and offer proposals regarding the transmission needs they believe are driven by Public
such requirements arise from state or federal laws or regulations that drive transmission needs and as long as the requirements of the procedures required herein are met. 215. Some commenters request that we specify EPA regulations or FPA section 217 as Public Policy Requirements driving potential transmission needs relevant for consideration in the transmission planning process.
transmission providers be required to state the baseline methodology on which load forecasts are based. However, Anbaric and PowerBridge suggest consideration of internal procedures to treat transmission project information as confidential, including protections to ensure that transmission projects that are not selected in the regional transmission plan will remain confidential.
/_layouts/miso/ecm/redirect.aspx?id=113167
+ Add

2013-03-22 142 FERC 61,215 Docket ER13-187-000; -001; ER13-186-000

requirements arise from local, state, or federal laws or regulations that drive transmission needs and as long as the requirements of the procedures required in Order No. 1000 are met.151 In addition, Order No. 1000 does not preclude any public utility transmission provider from considering in its transmission planning process transmission needs driven by additional public policy
further compliance filing to clarify in its Tariff that it will also consider duly enacted laws or regulations passed by a local governmental entity. 97. While the procedures required in Order No. 1000 are intended to be flexible enough to allow stakeholders to suggest the consideration of transmission needs driven by any Public Policy Requirement, the Commission declined in Order No.
State or Local Rights of First Refusal must be removed from its Tariff. MISO is correct that Order No. 1000 does not require removal from Commission-jurisdictional tariffs or agreements references to state or local laws or regulations with respect to construction of transmission facilities, including but not limited to authority over siting or permitting of transmission facilities.
/_layouts/miso/ecm/redirect.aspx?id=149972
+ Add

2014-09-17 Docket No. ER14-2892-000

unless Transmission Provider has established different requirements that apply to all generators in the Local Balancing Authority on a comparable basis. The applicable Local Balancing Authority power factor requirements are are listed on the Transmission Provider's website at Original Sheet No. 42 https://www.
AN OPERATIONAL PROCEDURE REQUIRES RE-CONFIGURING THE WIND FARM MANAGEMENT SYSTEM PRIOR TO CLOSING 'RI' Original Sheet No. 85 FUTURE DTE PINNEBOG 120 /345kV INTERCONNECT STATION ONE-LINE NOTES: FROM 120kV ECHO-PINNEBOG UNE 120kV BUS 145kV 3000A 40kA BREAKER 1.
unless Transmission Provider has established different requirements that apply to all generators in the Local Balancing Authority on a comparable basis. The applicable Local Balancing Authority power factor requirements are listed on the Transmission Provider's website at Original Sheet No. 42 https://www.
/_layouts/miso/ecm/redirect.aspx?id=184501
+ Add

GI G255 SIS Report

MISO generator interconnection procedures require that overloads be addressed before a generation interconnection is granted. Sensitivity analyses based on DC powerflow techniques were performed to identify the MW output of G255 that can safely be accommodated by the transmission system without causing interconnection related thermal violations under system intact and N-
see MAPP DRS document entitled "Steady-State Facility & Constrained Path Impact Determination Requirements & Screening Guidelines for Study Submissions" approved July 18, 2003), the minimum PTDF threshold for MAPP PTDF Interfaces is 5% and the minimum MW impact threshold is 1 MW or 1% of the impacted Path TTC (whichever is smaller).
localized in the vicinity of the point of interconnection. The study revealed that there are a number of new thermal overloads in the local area (See Tables 3.8 and 3.9). At the request of the transmission owners, reinforcement analysis was performed to determine whether interconnecting the Buffalo Ridge-Yankee-White 115kV line directly to the White 345kV substation via a dedicated
/_layouts/miso/ecm/redirect.aspx?id=13230
+ Add

20150305 SAWG Item 02 Resource Adequacy Issues Statement

Adequacy Requirements The Resource Adequacy Construct The primary responsibility for achieving Resource Adequacy resides with LSEs that are subject to State or local jurisdictional requirements. The Resource Adequacy construct helps to ensure reliability and the delivery of least-cost energy on a region-wide basis by sending signals that inform investment decisions on generation,
procedures require entities that plan to retire or suspend a generation unit to provide advance notice to MISO by submitting an Attachment Y notification of potential change in status. Upon receiving an Attachment Y Notice, MISO conducts a reliability study to determine whether the generation unit is necessary for the reliability of the transmission system.
The construct is intended to work for LSEs in traditional rate-regulated States and in Retail Choice States. In traditionally rate-regulated States, public utility commissions can set the Resource Adequacy-related requirements that LSEs must meet in all time horizons. In Retail Choice States, LSEs are not obligated to plan for or build generation to meet load.
/_layouts/miso/ecm/redirect.aspx?id=194865
+ Add

Exhibit B - Midwest ISO Assistance Application

United States Code. F. Protecting State and Local Government and Contractor Whistleblowers. The requirements of Section 1553 of the Act are summarized below. They include, but are not limited to: Prohibition on Reprisals: An employee of any non-Federal employer receiving covered funds under the American Recovery and Reinvestment Act of 2009,
Such Award must require compliance with the labor standards clauses and wage rate requirements of the Davis-Bacon Act (DBA) for work performed by all laborers and mechanics employed by Recipients (other than a unit of State or local government whose own employees perform the construction) Subrecipients, Contractors, and subcontractors.
State or local agency may not receive infrastructure investment funding from funds made available by the Act unless this certification is made and posted. 21. REPORTING AND REGISTRATION REQUIREMENTS UNDER SECTION 1512 OF THE RECOVERY ACT For Official Use Only For Official Use Only 10 (a) This award requires the recipient to complete projects or activities which are funded under the
/_layouts/miso/ecm/redirect.aspx?id=28951
+ Add

2015-12-31 Docket No. ER16-675-000

Interconnection Customer owns the Generating Facility and it is required to serve load; or (v) documentation of application for state and local air, water, land or federal nuclear permits and that MISO ATTACHMENT X FERC Electric Tariff Generator Interconnection Procedures (GIP) ATTACHMENTS 40.0.0, 41.0.0 Effective On: March 30, 2016 the application is proceeding per regulations.
attesting that Interconnection Customer owns the Generating Facility and it is required to serve load; or (v) documentation of MISO ATTACHMENT X FERC Electric Tariff Generator Interconnection Procedures (GIP) ATTACHMENTS 41.0.0 Effective On: March 30, 2016 application for state and local air, water, land or federal nuclear permits and that the application is proceeding per regulations.
required to meet the requirements of this interconnection procedure. 6.0 An equipment package does not include equipment provided by the utility. 7.0 Any equipment package approved and listed in a state by that state's regulatory body for interconnected operation in that state prior to the effective date of these small generator interconnection procedures shall be considered certified
/_layouts/miso/ecm/redirect.aspx?id=215282
+ Add

2012-05-17 139 FERC 61,132 Docket No. RM10-23-001 (Order 1000-A)

his Final Rule does not require removal of references to such state or local laws or regulations from Commission-approved tariffs or agreements."465 Accordingly, such a right based on a state or local law or regulation would still exist under state or local law even if removed from the Commission-jurisdictional tariff or agreement,
require the interregional transmission coordination procedures to meet the requirements of the transmission planning principles required for local planning (under Order No. 890) and regional planning (under Order No. 1000).596 The Commission explained that stakeholders will have the opportunity to participate fully in the consideration of interregional transmission facilities during
to amend their OATTs to describe procedures that provide for the consideration of transmission needs driven by Public Policy Requirements in the local and regional transmission planning processes.345 By considering transmission needs driven by Public Policy Requirements, the Commission explained that it meant: (1) the identification,
/_layouts/miso/ecm/redirect.aspx?id=131185
+ Add

2016-06-16 155 FERC 61,277 Docket No. RM16-1-000

requirements that will be needed for the generator to reliably interconnect to the transmission system.150 This point in the 149 Section 8.1 of the pro forma Large Generator Interconnection Procedures state that, simultaneous with the delivery of the System Impact Study, the transmission provider must provide the interconnection customer with an Interconnection Facilities Study Agreement.
Both the pro forma Large Generator Interconnection Procedures and the pro forma Small Generator Interconnection Procedures require interconnecting (continued ...) 20160616-3098 FERC PDF (Unofficial) 06/16/2016 Docket No. RM16-1-000 -13 -14. The requirements adopted by this Final Rule are intended to ensure that all generators, both synchronous and non-synchronous,
and regional transmission organizations (RTOs) have been developing new reactive power requirements and procedures to address deficiencies in the current method of requiring transmission providers to show through a System Impact Study that reactive power from an interconnecting wind generator is necessary to ensure safety or reliability.
/_layouts/miso/ecm/redirect.aspx?id=227303
+ Add

2011-07-15 136 FERC 61,035 Docket No. EL11-43-000

5 of its old interconnection procedures requiring study agreements for re-studies and revised section 11.3.2 of the GIA to specify that re-study agreements would not be required to conduct re-studies before the execution of a GIA.57IV. A. Discussion 35. Pursuant to Rule 214 of the Commission's Rules of Practice and Procedure, 18 C.
execute an agreement it has previously executed, then the GIP should explicitly state this as a requirement; but as of this moment it does not.6643. MISO also asserts that the precedent set under Order No. 2003's transition process supports its position that the exemption in section 5.1.1.1 was meant to be a temporary exemption.
with the exception of the revised requirements in Appendix 6 to this Attachment X."The Complaint 18 Edison Mission states that section 5.1 became effective on August 25, 2008 pursuant to the Queue Reform Order.199. Edison Mission states that the Edison Wind Projects qualify for the exclusion under section 5.
/_layouts/miso/ecm/redirect.aspx?id=112827
+ Add

2012-03-30 138 FERC 61,250 Docket Nos. EL11-53-000, ER12-188-000; -001

otherwise be required if the GIP were followed, and to jump ahead in the queue.29 Complainants also state that MISO has rationalized the ability of a Net Zero interconnection policy to avoid the procedures required by the Tariff by viewing the existing generator as having the ability to subcontract a portion of the energy production that it is permitted to generate to some other third-
For Elm Creek Wind, MISO states that it was studied for both ERIS and NRIS under MISO's interconnection procedures consistent with Order No. 2003. Steady state thermal overloads were found in the study, but only one of the overloads exceeded the threshold to require an upgrade for ERIS, which the customer selected.
MISO claims that all three interconnection requests made the network upgrades required for their requested level of service under the rules in place at the time.115 72. MISO states that Trimont Wind was studied in a group study under MISO's procedures that predated Order No. 2003. The System Impact Study for Trimont Wind 109 Id.
/_layouts/miso/ecm/redirect.aspx?id=129011
+ Add

MOD-32 Model Data Requirements and Reporting Procedures

requirement R1.3 the Requirements and Reporting Procedures manual is posted on the MISO web site at the following location: https://www.misoenergy.org/PLANNING/MODELS/Pages/MOD-032.aspx The purpose of this document is to outline these data reporting procedures needed to support the development of power flow and dynamics simulation base case models that realistically simulate steady
MISO 39 Appendix 1 Transmission Planner Compliance Pursuant to requirement R1 of MOD-032-1, MISO as a NERC Planning Coordinator (PC), and its NERC Transmission Planners (TPs) have jointly developed modeling data requirements and reporting procedures for MISO's planning area. Transmission Planners that have participated in the development of this document are as follows.
state model outlined in Section 3. If changes are required to the power flow data for dynamics they should be reflected in the steady-state power flow cases and the appropriate changes entered in MOD. 4.2.2 Dynamics Representation 4.2.2.1 Generators At a minimum, all generators with a nameplate greater than 20 MVA or a facility with an aggregated nameplate greater than 75 MVA must
/_layouts/miso/ecm/redirect.aspx?id=206069
+ Add

20130815 ENGCTF Item 06 Supplemental Issues Related to Resource Adequacy

s Emergency Operating Procedures require that firm load be shed, on a pro rata basis, over the entire energy deficient area. Thus, outages of gas fired generators that are accredited as a planning resource may impact stakeholders other than the generator owner. The penalty for a forced outage during a capacity emergency event associated with capacity accreditation is small (
Requires immediate removal of a unit from service, another Outage State or a Reserve Shutdown state; usually results from immediate mechanical/electrical/hydraulic control systems trips and operator initiated trips in response to unit alarms Unplanned (Forced) Outage - U2 Requires removal of unit from the in service state within 6 6IEEE Standard Definitions for Use in Reporting Electric
Postponed U3 Requires removal of unit from the in service state before the end of the next weekend Outages that are beyond the control of plant operators are termed Outside Management Control (OMC). A full listing of events that are considered OMC can be found in Appendix K of the GADS Data Reporting Instructions - January 2012 document,
/_layouts/miso/ecm/redirect.aspx?id=157748
+ Add

20131211 AC Item 02 ENGCTF Issue Summary Paper - Resource Adequacy

s Emergency Operating Procedures require that firm load be shed, on a pro rata basis, over the entire energy-deficient area. Thus, outages of gas-fired generators that are accredited as a planning resource may impact stakeholders other than the generator owner. The penalty for a forced outage during a capacity emergency event associated with capacity accreditation is small (
initiated trips in response to unit alarms Unplanned (Forced) Outage - Delayed U2 Requires removal of unit from the in-service state within 6 hours Unplanned (Forced) Outage - Postponed U3 Requires removal of unit from the in-service state before the end of the next weekend Outages that are beyond the control of plant operators are termed Outside Management Control (OMC).
Immediate U1 Requires immediate removal of a unit from service, another Outage State or a Reserve Shutdown state; usually results from immediate mechanical/electrical/hydraulic control systems 6IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity, available: http://www.
/_layouts/miso/ecm/redirect.aspx?id=164476
+ Add

20131010 ENGCTF Item 06 Issue Summary Resource Adequacy,pdf

s Emergency Operating Procedures require that firm load be shed, on a pro rata basis, over the entire energy-deficient area. Thus, outages of gas-fired generators that are accredited as a planning resource may impact stakeholders other than the generator owner. The penalty for a forced outage during a capacity emergency event associated with capacity accreditation is small (
initiated trips in response to unit alarms Unplanned (Forced) Outage - Delayed U2 Requires removal of unit from the in-service state within 6 hours Unplanned (Forced) Outage - Postponed U3 Requires removal of unit from the in-service state before the end of the next weekend Outages that are beyond the control of plant operators are termed Outside Management Control (OMC).
Immediate U1 Requires immediate removal of a unit from service, another Outage State or a Reserve Shutdown state; usually results from immediate mechanical/electrical/hydraulic control systems 6IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity, available: http://www.
/_layouts/miso/ecm/redirect.aspx?id=161425
+ Add

2011-11-23 Docket Nos. ER12-188-000 and EL11-53-000

Rule 214 of the Commission's Rules of Practice and Procedure requires that a movant demonstrate (1) that it has a right to participate conferred by rule or statute, (2) that it has or represents "an interest which may be directly affected by the outcome of the proceeding[,]" and (3) that its participation is in the public interest.
Pursuant to Rule 213 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (the "Commission" or "FERC"), 18 C.F.R. $ 385.213 (2011), the Midwest Independent Transmission System Operator, Inc. ("MISO") submits this Answer in response to the revised Motion to Intervene, Motion to Consolidate Dockets and Protest filed on November 15,
/_layouts/miso/ecm/redirect.aspx?id=120845
+ Add

Northern States Power Co dba Xcel Energy (Trans) -Northern States Power Co dba Xcel Energy (Gen) GIA J320/G237 SA1564 3rd Rev

Transmission Provider has established different requirements that apply to all generators in the Local Balancing Authority on a comparable basis. The applicable Local Balancing Authority power factor requirements are listed on the Transmission Provider's website at https://www.misoenergy.org/Library/Repository/Study/Generator%20Interconnec tion/Reactive%20Generator%20Requirements.
Procedures. Interconnection Study Agreement shall mean the form of agreement contained in Attachment B to Appendix 1 of the Generator Interconnection procedures for conducting all studies required by the Generator Interconnection Procedures. Interconnection System Impact Study shall mean an engineering study that evaluates the impact of the proposed interconnection on the safety
Each Party shall comply with the Applicable Reliability Council requirements. Each Party shall provide to any Party all information that may reasonably be required by that Party to comply with Applicable Laws and Regulations and Applicable Reliability Standards. 9.2 Local Balancing Authority Notification.
/_layouts/miso/ecm/redirect.aspx?id=219490
+ Add

Northern States Power Company-Prairie Rose Wind LLC GIA J183 SA2406 2nd Rev ER16-1501

unless Transmission Provider has established different requirements that apply to all generators in the Local Original Sheet No. 43 Balancing Authority on a comparable basis. The applicable Local Balancing Authority power factor requirements are listed on the Transmission Provider's website at https://www.
Procedures. Interconnection Study Agreement shall mean the form of agreement contained in Attachment B to Appendix 1 of the Generator Interconnection procedures for conducting all studies required by the Generator Interconnection Procedures. Interconnection System Impact Study shall mean an engineering study that evaluates the impact of the proposed interconnection on the safety
Transmission Provider, and to the Local Balancing Authority (The Transmission Owner.) The Interconnection Customer shall be required to meet the requirements of GIA Section 8.1 Interconnection Customer is responsible for installing all required communication equipment in the Interconnection Customer's substation.
/_layouts/miso/ecm/redirect.aspx?id=223328
+ Add

2015 State of the Market Report

local resource zones primarily based on transmission constraints and local reliability requirements. 2015-5 7 Implement Firm Capacity Delivery Procedures with PJM. 2015-6 7 Improve the modeling of transmission constraints in the PRA. 2015-7 7 Improve the physical withholding mitigation measures for the PRA by addressing uneconomic retirements and recognizing affiliates.
more than double the rate that would be required to permanently define an NCA). This provision would help ensure that transitory network conditions do not allow the exercise of substantial local market power. 2015 State of the Market Report Page 76 IX. DEMAND RESPONSE Demand response improves operational reliability, contributes to resource adequacy,
The obligation is set by the greater of the system-wide planning reserve requirement or the local clearing requirement. The minimum amount is the local clearing requirement, which is equal to the local resource requirement minus the maximum level of capacity imports. The maximum amount is equal to the obligation plus the maximum level of capacity exports.
/_layouts/miso/ecm/redirect.aspx?id=226445
+ Add

Northern States Power Company-Black Oak Wind Farm, LLC GIA 3rd Rev G858-H071 SA2693 ER15-2296 PUBLIC VER

Transmission Provider has established different requirements that apply to all generators in the Local Balancing Authority on a comparable basis. The applicable Local Balancing Authority power factor requirements are listed on the Transmission Provider's website at https://www.misoenergy.org/Library/Repository/Study/Generator%20Interconnec tion/Reactive%20Generator%20Requirements.
Procedures. Interconnection Study Agreement shall mean the form of agreement contained in Attachment B to Appendix 1 of the Generator Interconnection procedures for conducting all studies required by the Generator Interconnection Procedures. Interconnection System Impact Study shall mean an engineering study that evaluates the impact of the proposed interconnection on the safety
Each Party shall comply with the Applicable Reliability Council requirements. Each Party shall provide to any Party all information that may reasonably be required by that Party to comply with Applicable Laws and Regulations and Applicable Reliability Standards. 9.2 Local Balancing Authority Notification.
/_layouts/miso/ecm/redirect.aspx?id=204668
+ Add

North States Power Company-Red Pine Wind Project LLC GIA H081 SA2753 3rd Rev ER17-1405

unless the Transmission Provider has established different requirements that apply to all synchronous generators in the Local Balancing Authority on a comparable basis. The applicable Local Balancing Authority power factor requirements are listed on the Transmission Provider's website at https://www.
unless the Transmission Provider has established different requirements that apply to all non-synchronous generators in the Local Balancing Authority on a comparable basis. The applicable Local Balancing Authority power factor requirements are listed on the Transmission Provider's website at https://www.
Procedures. Interconnection Study Agreement shall mean the form of agreement contained in Attachment B to Appendix 1 of the Generator Interconnection procedures for conducting all studies required by the Generator Interconnection Procedures. Interconnection System Impact Study shall mean an engineering study that evaluates the impact of the proposed interconnection on the safety
/_layouts/miso/ecm/redirect.aspx?id=249413
+ Add

Northern States Power Company-North Star Solar PV LLC J385 GIA 1st Rev. SA2871 ER17-329

unless Transmission Provider has established different requirements that apply to all generators in the Local Original Sheet No. 43 Balancing Authority on a comparable basis. The applicable Local Balancing Authority power factor requirements are listed on the Transmission Provider's website at https://www.
Procedures. Interconnection Study Agreement shall mean the form of agreement contained in Attachment B to Appendix 1 of the Generator Interconnection procedures for conducting all studies required by the Generator Interconnection Procedures. Interconnection System Impact Study shall mean an engineering study that evaluates the impact of the proposed interconnection on the safety
Each Party shall comply with the Applicable Reliability Council requirements. Each Party shall provide to any Party all information that may reasonably be required by that Party to comply with Applicable Laws and Regulations and Applicable Reliability Standards. Original Sheet No. 42 9.2 Local Balancing Authority Notification.
/_layouts/miso/ecm/redirect.aspx?id=240164

1 2 3 4 5 ... 35 Next Last

Legend

  • PowerPoint Document
  • PDF Document
  • Word Document
  • Excel Document
  • Add To My Subscriptions
  • Image (GIF/JPG/PNG)
  • Web Page
  • Calendar Event