Results 

Loading....

Search Results For 'State and Local Procedural Requirements' ( 938 matches )

+ Add

2014-10-20 Docket No. ER15-133-000

0 Effective On: July 28, 2010 the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 37.0.0 Effective On: January 1, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
0 Effective On: January 1, 2015 applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
/_layouts/miso/ecm/redirect.aspx?id=186529
+ Add

2016-06-14 Docket No. ER16-1922-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 41.0.0, 50.0.0 Effective On: August 6, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 50.0.0 Effective On: August 6, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
/_layouts/miso/ecm/redirect.aspx?id=227076
+ Add

2013-04-02 Docket No. ER13-1227-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=149920
+ Add

2012-04-18 Docket No. ER12-1564-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=129469
+ Add

2012-07-30 Docket No. ER12-1577-001

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=135070
+ Add

2012-10-25 Docket No. ER13-186-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=140484
+ Add

20170526 MISO PJM IPSAC Item XX 2017-04-24 Docket No. ER16-1969-004

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 52.
/_layouts/miso/ecm/redirect.aspx?id=251039
+ Add

2012-04-19 Docket No. ER12-1577-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=129553
+ Add

2016-08-19 Docket No. ER16-1922-001

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 51.
/_layouts/miso/ecm/redirect.aspx?id=231652
+ Add

2016-03-01 Docket No. ER16-469-001

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 47.
/_layouts/miso/ecm/redirect.aspx?id=219562
+ Add

2013-07-22 Docket No. ER13-187-003

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
/_layouts/miso/ecm/redirect.aspx?id=156263
+ Add

2017-10-06 Docket No. ER18-40-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 55.
/_layouts/miso/ecm/redirect.aspx?id=260599
+ Add

2014-07-14 Docket No. ER13-187-008

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 35.0.0 Effective On: June 1, 2013 applicable to the planning or siting of transmission facilities by the Transmission Owners.
0 Effective On: June 1, 2013 applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
/_layouts/miso/ecm/redirect.aspx?id=180164
+ Add

2017-11-30 Docket No. ER18-364-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 55.
/_layouts/miso/ecm/redirect.aspx?id=264398
+ Add

2015-12-04 Docket No. ER16-469-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 42.
/_layouts/miso/ecm/redirect.aspx?id=213503
+ Add

2017-10-06 Docket No. ER18-39-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 55.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 56.
/_layouts/miso/ecm/redirect.aspx?id=260596
+ Add

2016-05-19 Docket No. ER16-1746-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 48.
/_layouts/miso/ecm/redirect.aspx?id=225072
+ Add

2012-10-25 Docket No. ER13-187-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=140485
+ Add

2011-11-21 Docket No. ER12-451-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
required to meet the requirements of this interconnection procedure. 6.0 An equipment package does not include equipment provided by the utility. 7.0 Any equipment package approved and listed in a state by that state's regulatory body for interconnected operation in that state prior to the effective date of these small generator interconnection procedures shall be considered certified
/_layouts/miso/ecm/redirect.aspx?id=120705
+ Add

2010-07-15 Docket No. ER10-1791-000 Entire Transmission Cost Allocation

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
compliance with local reliability standards and requirements when applicable, iii) compliance with Transmission Owner standards if applicable, iv) compliance with applicable state and federal laws and v) compliance with applicable regulatory mandates and obligations, including regulatory obligations related to serving load,
/_layouts/miso/ecm/redirect.aspx?id=1730
+ Add

Order 1000 ROFR_DRAFT Attachment FF

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=138158
+ Add

Tariff_Attachment FF DRAFT Order 1000 Revisions 10192012

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=139814
+ Add

DRAFT Order 1000 Att FF_Generic

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=154738
+ Add

Order 1000 Regional Planning Compliance_DRAFT Attachment FF

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=138156
+ Add

2011-08-12 Docket No. ER11-4305-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=114424

1 2 3 4 5 ... 38 Next Last

Legend

  • PowerPoint Document
  • PDF Document
  • Word Document
  • Excel Document
  • Add To My Subscriptions
  • Image (GIF/JPG/PNG)
  • Web Page
  • Calendar Event