Results 

Loading....

Search Results For 'State and Local Procedural Requirements' ( 905 matches )

+ Add

2015-02-23 Docket No. ER13-187-010

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 35.0.0, 38.0.0 Effective On: June 1, 2013 applicable to the planning or siting of transmission facilities by the Transmission Owners.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 38.0.0 Effective On: June 1, 2013 applicable to the planning or siting of transmission facilities by the Transmission Owners.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 39.0.0 Effective On: January 1, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
/_layouts/miso/ecm/redirect.aspx?id=194322
+ Add

2014-10-20 Docket No. ER15-133-000

0 Effective On: July 28, 2010 the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 37.0.0 Effective On: January 1, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
0 Effective On: January 1, 2015 applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
/_layouts/miso/ecm/redirect.aspx?id=186529
+ Add

2015-12-23 Docket No. ER13-1923-003

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 40.0.0, 46.0.0 Effective On: January 1, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 46.0.0 Effective On: January 1, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
/_layouts/miso/ecm/redirect.aspx?id=214804
+ Add

2016-06-14 Docket No. ER16-1922-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 41.0.0, 50.0.0 Effective On: August 6, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 50.0.0 Effective On: August 6, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
/_layouts/miso/ecm/redirect.aspx?id=227076
+ Add

2015-12-14 Docket No. ER15-2657-001

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 42.0.0, 44.0.0 Effective On: November 16, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 44.0.0 Effective On: November 16, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
/_layouts/miso/ecm/redirect.aspx?id=214182
+ Add

2013-05-20 Docket No. ER13-186-002

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=152760
+ Add

2013-07-10 Docket No. ER13-1945-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=155596
+ Add

2013-04-02 Docket No. ER13-1227-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=149920
+ Add

2012-04-18 Docket No. ER12-1564-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=129469
+ Add

2012-07-30 Docket No. ER12-1577-001

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=135070
+ Add

2012-10-25 Docket No. ER13-186-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=140484
+ Add

2013-08-14 Docket No. ER13-186-003

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
including accepted NERC reliability standards and reliability standards adopted by Regional Entities, local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and Regulations.
/_layouts/miso/ecm/redirect.aspx?id=157750
+ Add

2013-08-14 Docket No. ER13-2156-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
including accepted NERC reliability standards and reliability standards adopted by Regional Entities, local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and Regulations.
/_layouts/miso/ecm/redirect.aspx?id=157751
+ Add

2014-04-07 Docket No. ER12-1564-001

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
including accepted NERC reliability standards and reliability standards adopted by Regional Entities, local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and Regulations.
/_layouts/miso/ecm/redirect.aspx?id=173436
+ Add

2014-06-04 Docket No. ER13-187-006

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 34.
/_layouts/miso/ecm/redirect.aspx?id=177456
+ Add

2013-07-10 Docket No. ER13-1923-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
/_layouts/miso/ecm/redirect.aspx?id=155571
+ Add

20170526 MISO PJM IPSAC Item XX 2017-04-24 Docket No. ER16-1969-004

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 52.
/_layouts/miso/ecm/redirect.aspx?id=251039
+ Add

2012-04-19 Docket No. ER12-1577-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, and any economic or other planning criteria or metrics defined in this Attachment FF. Transmission Owners are required to annually provide updated copies of local planning criteria for posting on the Transmission Provider'
dispute may be resolved through the dispute resolution procedures provided in the Tariff, or in any applicable joint operating agreement, or by the Commission or state regulatory authorities, where appropriate. The MTEP shall have as one of its goals the satisfaction of all regulatory requirements as specified in Appendix B or Article IV, Section I, Paragraph C of the ISO Agreement.
/_layouts/miso/ecm/redirect.aspx?id=129553
+ Add

2016-06-20 Docket No. ER16-1969-001

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 51.
/_layouts/miso/ecm/redirect.aspx?id=227495
+ Add

2015-06-22 Docket No. ER13-1923-002

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 39.0.0, 40.0.0 Effective On: January 1, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
In addition to the requirements of this Attachment FF, there may be state or local procedural requirements MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 40.0.0 Effective On: January 1, 2015 applicable to the planning or siting of transmission facilities by the Transmission Owners.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
/_layouts/miso/ecm/redirect.aspx?id=202482
+ Add

2016-08-19 Docket No. ER16-1922-001

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 51.
/_layouts/miso/ecm/redirect.aspx?id=231652
+ Add

2016-03-01 Docket No. ER16-469-001

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 47.
/_layouts/miso/ecm/redirect.aspx?id=219562
+ Add

2013-07-22 Docket No. ER13-187-003

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
federal laws, state laws, local laws, state and local building codes, federal regulatory requirements, state and local regulatory requirements, state and local licensing authorities, the National Electric Safety Code, the National Electric Code, Applicable Reliability Standards, and Good Utility Practice;
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
/_layouts/miso/ecm/redirect.aspx?id=156263
+ Add

2017-10-06 Docket No. ER18-40-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 55.
/_layouts/miso/ecm/redirect.aspx?id=260599
+ Add

2016-06-20 Docket No. ER16-1969-000

In addition to the requirements of this Attachment FF, there may be state or local procedural requirements applicable to the planning or siting of transmission facilities by the Transmission Owners. A current list of those requirements can be found on the Transmission Provider's website.
applicable state and local laws; applicable state and local building codes; federal regulatory requirements; applicable state and local regulatory requirements; applicable state and local licensing authorities; the National Electric Safety Code; the National Electric Code;
local planning reliability or economic planning criteria of the Transmission Owner, or required by State or local authorities, any economic or other planning criteria or metrics defined in this Attachment FF, and any Applicable Laws and MISO ATTACHMENT FF FERC Electric Tariff Transmission Expansion Planning Protocol ATTACHMENTS 51.
/_layouts/miso/ecm/redirect.aspx?id=227496

1 2 3 4 5 ... 37 Next Last

Legend

  • PowerPoint Document
  • PDF Document
  • Word Document
  • Excel Document
  • Add To My Subscriptions
  • Image (GIF/JPG/PNG)
  • Web Page
  • Calendar Event